Development Strategic Framework 2026–2030 and the 2026–2028 Medium-Term Plan

Rehabilitate core energy, water and transport infrastructure

At riskReconstruction & Infrastructure

Substations and renewable fields, water and sanitation networks, and rehabilitated roads and bridges across the governorates.

⁦74%⁩

Attainment

of the ⁦85%⁩ target

Attainment through 2026

Weight in theme

⁦60%⁩

Reconstruction & Infrastructure

KPI status

3

  • On track1
  • At risk1
  • Off track1

Linked budget

SYP 79.7B

11 projects

Why this objective

Power, water and roads are the condition for every other recovery: a substation in Aleppo, a water network in Suwayda or a road to Daraa brings a whole governorate back to life.

Values it carries

  • Fairness & balance across the governorates

Attainment through 2026

The objective’s monthly attainment against this year’s target.

Attainment through 2026
Attainment through 2026
PeriodAttainment
Jan⁦63.6%⁩
Feb⁦63.8%⁩
Mar⁦65.7%⁩
Apr⁦66.2%⁩
May⁦68.3%⁩
Jun⁦69.3%⁩
Jul⁦70.0%⁩
Aug⁦71.7%⁩
Sep⁦72.8%⁩
Oct⁦74.0%⁩

KPIs

Baseline, target and actual for each KPI, and progress from baseline to target.

Sub-objectives

Their weights inside the objective and their progress; the weighted sum is the objective’s attainment.

  • Rehabilitate the energy and water systems in the governorates

    OBJ-01.1

    Weight

    ⁦50%⁩

    ⁦70%⁩Eng. Maher Al-HamawiEng. Maher Al-HamawiDirector, Energy, Water & Utilities ProjectsP-021maher.alhamawi@psa.gov.sy
  • Rehabilitate the transport corridors and national connectivity

    OBJ-01.2

    Weight

    ⁦30%⁩

    ⁦76%⁩Eng. Qasem Al-HaririEng. Qasem Al-HaririDirector, Transport & Housing ProjectsP-020qasem.alhariri@psa.gov.sy
  • Renewable energy for governorates far from the grid

    OBJ-01.3

    Weight

    ⁦20%⁩

    ⁦81%⁩Eng. Rami YoussefEng. Rami YoussefDirector, Renewable Energy & Environment ProjectsP-028rami.youssef@psa.gov.sy

Contributing initiatives & projects

The objective’s approved initiatives and their projects, and each project’s share of the contribution by budget.

Eng. George HaddadEng. George HaddadDirector, Data Centres & Government NetworkP-024george.haddad@psa.gov.sySYP9.1BAt risk
Eng. Maher Al-HamawiEng. Maher Al-HamawiDirector, Energy, Water & Utilities ProjectsP-021maher.alhamawi@psa.gov.sySYP12BCritical
Eng. Rami YoussefEng. Rami YoussefDirector, Renewable Energy & Environment ProjectsP-028rami.youssef@psa.gov.sySYP3.2BOn hold

Projects contributing from other objectives’ initiatives

Approval & change log

This item’s definition as approved in the plan version in force, and every change request on it with the old and proposed values and the decision.

Approved in plan version ⁦1.1⁩Higher Council resolution HCED-2026-032026-03-25

No change requests on this item since the plan was approved.

Corrective actions

What we are doing to bring the KPI back on track, who owns it, and by when.

  • Speed up the allocation of the Darayya site’s northern plot with Rif Dimashq Governorate and the electricity transmission & distribution establishment

    Eng. Wassim Al-AzmEng. Wassim Al-AzmDirector General, Infrastructure & Reconstruction ProjectsP-013wassim.alazm@psa.gov.syDue ⁦2026-10-20⁩8 days overdue2026-10-20K-2.1.1Darayya Replacement Housing
    Overdue
  • Take the utility networks of the Darayya replacement housing out of the buildings contract and tender them separately

    Eng. Qasem Al-HaririEng. Qasem Al-HaririDirector, Transport & Housing ProjectsP-020qasem.alhariri@psa.gov.syDue ⁦2026-11-30⁩In 33 days2026-11-30K-2.1.1Darayya Replacement Housing
    In progress
  • An extra evening shift on the Aleppo substation bays until year end

    Eng. Maher Al-HamawiEng. Maher Al-HamawiDirector, Energy, Water & Utilities ProjectsP-021maher.alhamawi@psa.gov.syDue ⁦2026-12-31⁩In 64 days2026-12-31K-2.1.2Aleppo 230 kV Substations Rehabilitation
    In progress
  • Rehabilitate two more pumping stations in the Suwayda water network within the current works

    Eng. Rami YoussefEng. Rami YoussefDirector, Renewable Energy & Environment ProjectsP-028rami.youssef@psa.gov.syDue ⁦2026-12-31⁩In 64 days2026-12-31K-2.1.2Suwayda Drinking-Water Network from Al-Ain Dam
    Open

Challenges & notes

What holds the objective back and what leadership should know.

  • Challenge

    The late allocation of the Darayya site’s northern plot and the utility diversions held up blocks 3 and 4 by about four months.

    Eng. Qasem Al-Hariri · 2026-10-12

  • Challenge

    Groundwater between axes 12 and 16 at the Douma treatment plant has raised the forecast foundation cost.

    Eng. Wael Al-Khawlani · 2026-09-28

  • Note

    The national projects steering committee advised taking the Darayya utility networks out of the buildings contract to speed up delivery.

    Eng. Wassim Al-Azm · 2026-10-05