Confidential
Syrian Arab Republic
Planning and Statistics Authority
National Project Management Office (PMO)
- Code
- DOC-0408
- Version
- V1
- Date
- 2026-07-22
Mid-year 2026 strategic review minutes and target-update requests
1. Purpose
The mid-year review minutes: what was achieved, the targets proposed for re-evaluation with their reasons (from → to), and the National Projects Steering Committee’s decisions.
- Entity
- Planning and Statistics Authority
- Plan
- Development Strategic Framework 2026–2030
- Owner
- Rana Al-Samman
- Version
- V1
Linked strategic objectives
| Code | Objective | Owner | Weight |
|---|---|---|---|
| SO-2.1 | Rehabilitate core energy, water and transport infrastructure | Eng. Wassim Al-Azm | 60% |
| SO-2.2 | Rebuild damaged areas and provide replacement housing | Eng. Qasem Al-Hariri | 40% |
Linked initiatives
- SI-1.1.2 — Industrial recovery & skills
Linked KPIs
| Code | KPI | Baseline | 2026 target | Actual |
|---|---|---|---|---|
| K-2.1.2 | Public facilities rehabilitated this year (cumulative) | 0 facilities | 60 facilities | 48 facilities |
| K-2.2.1 | Damaged neighbourhoods covered by reconstruction plans | 15 % | 60 % | 41 % |
Prepared by
Rana Al-Samman
Deputy President, Strategy & Performance
Dr. Ziad Al-Atassi
Confidential