Damaged neighbourhoods covered by reconstruction plans

Off trackSystem reading, owner to confirm

Rebuild damaged areas and provide replacement housing·Reconstruction & Infrastructure

Actual · October

41%

2026 target

⁦60%⁩

Attainment

⁦68%⁩

Year-end forecast

⁦47%⁩

Forecast gap to target

⁦13%⁩

The path from baseline to 2030

Where the KPI stands today between its baseline, this year’s target and the 2030 target.

Baseline

⁦15%⁩

Today

⁦41%⁩

2026 target

⁦60%⁩

2030 target

⁦85%⁩

Left to the 2026 target
⁦19%⁩⁦58%⁩ of the way covered
Left to the 2030 target
⁦44%⁩⁦37%⁩ of the way covered

Monthly series and forecast

January – October measured, November and December forecast with a confidence band; the gold line is the 2026 target.

Monthly series and forecast
  • Actual
  • Baseline
  • Forecast
  • Forecast range
Monthly series and forecast
PeriodActualBaseline
Jan16 %15 %
Feb18 %15 %
Mar20 %15 %
Apr23 %15 %
May26 %15 %
Jun29 %15 %
Jul32 %15 %
Aug35 %15 %
Sep38 %15 %
Oct41 %15 %
Nov (Forecast)44 %15 %
Dec (Forecast)47 %15 %

Period comparison

Quarter by quarter in 2026, the same month last year, and the years since 2024 with the 2026 year-end forecast.

Quarter by quarter — 2026

  1. Q1

    20

  2. Q2

    29

    +9Better

  3. Q3

    38

    +9Better

  4. October

    41

    +3Better

October 2025 vs October 2026

October 2025

14

October 2026

41

+27Better

Years

  • Value
  • 2026 target

Measurement history

Every reading with who entered it, its evidence and its approval. Formal measurement points are marked.

PeriodValueOf targetKindStateEntered byEvidence
October 202641⁦68%⁩Formal measurementAwaiting ownerSystem (automatic reading)2026-10-26None
September 202638⁦63%⁩Formal measurementApprovedEng. Qasem Al-Hariri2026-10-05K-2.2.1_2026-09.pdf
August 202635⁦58%⁩Formal measurementApprovedEng. Qasem Al-Hariri2026-09-04K-2.2.1_2026-08.pdf
July 202632⁦53%⁩Formal measurementApprovedEng. Qasem Al-Hariri2026-08-07K-2.2.1_2026-07.pdf
June 202629⁦48%⁩Formal measurementApprovedEng. Qasem Al-Hariri2026-07-06K-2.2.1_2026-06.pdf
May 202626⁦43%⁩Formal measurementApprovedEng. Qasem Al-Hariri2026-06-05K-2.2.1_2026-05.pdf
April 202623⁦38%⁩Formal measurementApprovedEng. Qasem Al-Hariri2026-05-04K-2.2.1_2026-04.pdf
March 202620⁦33%⁩Formal measurementApprovedEng. Qasem Al-Hariri2026-04-07K-2.2.1_2026-03.pdf
February 202618⁦30%⁩Formal measurementApprovedEng. Qasem Al-Hariri2026-03-06K-2.2.1_2026-02.pdf
January 202616⁦27%⁩Formal measurementApprovedEng. Qasem Al-Hariri2026-02-05K-2.2.1_2026-01.pdf

Contributing projects

The projects that move this KPI, and each one’s share of the effect by budget size.

AI insight

Closing the gap runs through one project

The project with the most weight on this KPI is “Darayya Replacement Housing”, with ⁦61%⁩ of the linked budget, and it is Off track. Speeding it up is the fastest way to close the gap before December.

Confidence⁦78%⁩

Approval & change log

This item’s definition as approved in the plan version in force, and every change request on it with the old and proposed values and the decision.

Approved in plan version ⁦1.1⁩Higher Council resolution HCED-2026-032026-03-25

No change requests on this item since the plan was approved.

Corrective actions

What we are doing to bring the KPI back on track, who owns it, and by when.

  • Workshops with the three governorate councils slowest in preparing damaged-neighbourhood plans

    Iman Al-JasemIman Al-JasemDirector General, Medium-Term PlanP-048iman.aljasem@psa.gov.syDue ⁦2026-10-30⁩In 2 days2026-10-30
    In progress
  • Contract two engineering design offices to clear the backlog of neighbourhood plans

    Iman Al-JasemIman Al-JasemDirector General, Medium-Term PlanP-048iman.aljasem@psa.gov.syDue ⁦2026-11-10⁩In 13 days2026-11-10
    In progress
  • Require the governorate planning directorates to log neighbourhood field-survey results within 48 hours

    Eng. Mustafa Al-AwaEng. Mustafa Al-AwaDeputy President, PlanningP-047mustafa.alawa@psa.gov.syDue ⁦2026-12-31⁩In 64 days2026-12-31
    Open

Comments

The owner, the Performance Measurement Office and leadership discussing the readings.

  1. Iman Al-JasemDirector General, Medium-Term Plan2026-10-24 10:00

    The reading is automatic from the national neighbourhood survey log. I am waiting for 40 finished plans to be approved before confirming.

0 / 600

Esc

Quick actions

Go to

Projects

↑↓to move↵to openEscto close