Development Strategic Framework 2026–2030 and the 2026–2028 Medium-Term Plan

Rebuild damaged areas and provide replacement housing

Off trackReconstruction & Infrastructure

Reconstruction plans for damaged neighbourhoods, replacement homes for returning families and services back in the towns.

⁦66%⁩

Attainment

of the ⁦80%⁩ target

Attainment through 2026

Weight in theme

⁦40%⁩

Reconstruction & Infrastructure

KPI status

2

  • On track1
  • At risk0
  • Off track1

Linked budget

SYP 57.1B

4 projects

Why this objective

Damaged neighbourhoods in Rif Dimashq, Aleppo, Homs, Idlib and Deir ez-Zor need plans and replacement housing before any other project; a plan with no funding and no schedule brings nobody home.

Values it carries

  • Partnership

Attainment through 2026

The objective’s monthly attainment against this year’s target.

Attainment through 2026
Attainment through 2026
PeriodAttainment
Jan⁦49.0%⁩
Feb⁦50.9%⁩
Mar⁦53.4%⁩
Apr⁦54.3%⁩
May⁦56.9%⁩
Jun⁦57.9%⁩
Jul⁦60.7%⁩
Aug⁦62.4%⁩
Sep⁦63.8%⁩
Oct⁦66.0%⁩

KPIs

Baseline, target and actual for each KPI, and progress from baseline to target.

Sub-objectives

Their weights inside the objective and their progress; the weighted sum is the objective’s attainment.

  • Approve reconstruction plans for damaged neighbourhoods

    OBJ-09.1

    Weight

    ⁦55%⁩

    ⁦62%⁩Iman Al-JasemIman Al-JasemDirector General, Medium-Term PlanP-048iman.aljasem@psa.gov.sy
  • Deliver replacement housing units to plan

    OBJ-09.2

    Weight

    ⁦45%⁩

    ⁦71%⁩Eng. Qasem Al-HaririEng. Qasem Al-HaririDirector, Transport & Housing ProjectsP-020qasem.alhariri@psa.gov.sy

Contributing initiatives & projects

The objective’s approved initiatives and their projects, and each project’s share of the contribution by budget.

Eng. Qasem Al-HaririEng. Qasem Al-HaririDirector, Transport & Housing ProjectsP-020qasem.alhariri@psa.gov.sySYP51.1BOff track

Projects contributing from other objectives’ initiatives

AI insight

What moves this objective?

The objective’s weakest KPI, “Damaged neighbourhoods covered by reconstruction plans”, is at ⁦68%⁩ of its target, and its heaviest project, “Darayya Replacement Housing”, is Off track. Fixing that one path lifts the objective more than any other action.

Confidence⁦81%⁩

Approval & change log

This item’s definition as approved in the plan version in force, and every change request on it with the old and proposed values and the decision.

Approved in plan version ⁦1.1⁩Higher Council resolution HCED-2026-032026-03-25

No change requests on this item since the plan was approved.

Corrective actions

What we are doing to bring the KPI back on track, who owns it, and by when.

  • Workshops with the three governorate councils slowest in preparing damaged-neighbourhood plans

    Iman Al-JasemIman Al-JasemDirector General, Medium-Term PlanP-048iman.aljasem@psa.gov.syDue ⁦2026-10-30⁩In 2 days2026-10-30K-2.2.1
    In progress
  • Contract two engineering design offices to clear the backlog of neighbourhood plans

    Iman Al-JasemIman Al-JasemDirector General, Medium-Term PlanP-048iman.aljasem@psa.gov.syDue ⁦2026-11-10⁩In 13 days2026-11-10K-2.2.1
    In progress
  • Require the governorate planning directorates to log neighbourhood field-survey results within 48 hours

    Eng. Mustafa Al-AwaEng. Mustafa Al-AwaDeputy President, PlanningP-047mustafa.alawa@psa.gov.syDue ⁦2026-12-31⁩In 64 days2026-12-31K-2.2.1
    Open

Challenges & notes

What holds the objective back and what leadership should know.

  • Challenge

    The field survey of damaged neighbourhoods ran two months late, so only two thirds of the first half’s plans were approved.

    Iman Al-Jasem · 2026-10-13

  • Challenge

    The medium-term plan tracker is still at initiation and will not move the KPI before Q1 2027.

    Eng. Mustafa Al-Awa · 2026-10-09