Planning and Statistics AuthorityMunjaz11My actionsNotificationsالعربية

Procurement

The procurement plan: packages, methods, evaluation and award.

Working on:Planning and Statistics Authority
Packages in the plan
18

FY2026: ⁦14⁩ · FY2027: ⁦4⁩

Estimated value
SYP 19.7B

FY2027 plan: SYP 3.6B

In the market now
8

SYP 13.2B

Awaiting award
3

With the procurement committee

Award savings
SYP 15M

⁦7.1%⁩ below estimate

Procurement timeline

Bars: planned spans of each step; diamonds: actual dates; gold line: today

Package
2025 Oct  2026Jan   Apr   Jul   Oct  2027Jan   Apr   Jul  
Prepare booklet Issue Bids close Evaluate Award Actual date Today

ERP contracts & procurement integration

The data is ready to exchange with the ERP contracts & procurement module, and tender files above SYP 5M go to the General Authority for Supply and Provision; automatic sync starts once the connector is switched on.

Integration-ready for the ERP contracts & procurement module

The integration layer is in place; data exchange starts once the permissions and interfaces are granted.

  • Tender, bid and award fields mapped to the ERP procurement data model
  • A supplier-portal reference kept for every published package
  • Awards linked to contracts and certificates in Munjaz
  • Awaiting the connector permissions from Enterprise Systems
  • Awaiting the integration interfaces for automatic sync

References ready to sync

Packages with a supplier-portal reference: ⁦10⁩

  • Deir ez-Zor suspension bridge reconstruction — main works260614031187Awaiting link
  • Deir ez-Zor suspension bridge — engineering supervision260705031244Awaiting link
  • Paper civil-registry records — scanning and automated indexing261004031302Awaiting link
  • Identity & access management licences260914031355Awaiting link
  • Advisory — the 2026–2028 medium-term plan & governorate plans260224030418Awaiting link
  • Digital crop-survey app & field enumerator training251006029877Awaiting link
  • Learning-content provider for the Raqqa schools e-learning platform261012031366Awaiting link
Esc

Quick actions

Go to

Projects

↑↓to move↵to openEscto close