O-3 · Authority level
Official figures as the reference for development decisions
The Q3 statistical bulletin came out on 12 October; this quarter we make the national indicators portal the reference the ministries and governorates cite.
- Progress
- 53%
- Key results done
- 1 / 3
- Average confidence
- 7.7
- Cycle
- Q4 2026
Expected by today 30%
Of the objective’s key results
Of 10
2026-10-01 → 2026-12-31
KR-03.1User satisfaction with the quarterly statistical bulletin at 90% or more
- Start
- 86%
- Current
- 92%
- Target
- 90%
Planned to date 30%
The result since the cycle began
%
Check-ins (2)
2026-10-15 · Dr. Firas Al-Obaid
10highThe owner’s confidence of reaching the target by the end of the cycle: 10 of 10. 7 and above is high, 4 to 6 medium, 3 and below low.92%
Final survey result 92% from 1,940 respondents in the ministries and governorates.
2026-10-01 · Dr. Firas Al-Obaid
8highThe owner’s confidence of reaching the target by the end of the cycle: 8 of 10. 7 and above is high, 4 to 6 medium, 3 and below low.86%
KR-03.2Publish 12 statistical bulletins and reports this year
- Start
- 7 bulletins
- Current
- 8 bulletins
- Target
- 12 bulletins
Planned to date 30%
The result since the cycle began
bulletins
Check-ins (2)
2026-10-15 · Razan Al-Rifai
7highThe owner’s confidence of reaching the target by the end of the cycle: 7 of 10. 7 and above is high, 4 to 6 medium, 3 and below low.8 bulletins
2026-10-01 · Razan Al-Rifai
7highThe owner’s confidence of reaching the target by the end of the cycle: 7 of 10. 7 and above is high, 4 to 6 medium, 3 and below low.7 bulletins
KR-03.3Grow national indicators portal visits to 16 thousand a month
- Start
- 12.9 thousand visits
- Current
- 14.1 thousand visits
- Target
- 16 thousand visits
Planned to date 30%
The result since the cycle began
thousand visits
Check-ins (2)
2026-10-15 · Razan Al-Rifai
6mediumThe owner’s confidence of reaching the target by the end of the cycle: 6 of 10. 7 and above is high, 4 to 6 medium, 3 and below low.14.1 thousand visits
2026-10-01 · Razan Al-Rifai
6mediumThe owner’s confidence of reaching the target by the end of the cycle: 6 of 10. 7 and above is high, 4 to 6 medium, 3 and below low.13.4 thousand visits