O-3.1 · National Indicators & Open Data Directorate
The national indicators portal as the statistical data reference for all 14 governorates
On track
The national indicators directorate publishes the sector indicators and open dashboards.
- Progress
- 45%
- Key results done
- 0 / 2
- Average confidence
- 6.5
- Cycle
- Q4 2026
Expected by today 30%
Of the objective’s key results
Of 10
2026-10-01 → 2026-12-31
KR-15.1Publish 6 quarterly sector indicators
- Start
- 0 indicators
- Current
- 3 indicators
- Target
- 6 indicators
Progress20% ahead50%
Planned to date 30%
On track7highThe owner’s confidence of reaching the target by the end of the cycle: 7 of 10. 7 and above is high, 4 to 6 medium, 3 and below low.
Next update 29 OctoberMoaz KaddourMoaz KaddourData EngineerP-032moaz.kaddour@psa.gov.sy
The result since the cycle began
indicators
Check-ins (2)
2026-10-15 · Moaz Kaddour
7highThe owner’s confidence of reaching the target by the end of the cycle: 7 of 10. 7 and above is high, 4 to 6 medium, 3 and below low.3 indicators
2026-10-01 · Moaz Kaddour
7highThe owner’s confidence of reaching the target by the end of the cycle: 7 of 10. 7 and above is high, 4 to 6 medium, 3 and below low.1 indicators
KR-15.2Run an open data dashboard for 10 sectors
- Start
- 0 sectors
- Current
- 4 sectors
- Target
- 10 sectors
Progress10% ahead40%
Planned to date 30%
At risk6mediumThe owner’s confidence of reaching the target by the end of the cycle: 6 of 10. 7 and above is high, 4 to 6 medium, 3 and below low.
Next update 29 OctoberRazan Al-RifaiRazan Al-RifaiDirector, Data & AIP-027razan.alrifai@psa.gov.sy
The result since the cycle began
sectors
Check-ins (2)
2026-10-15 · Razan Al-Rifai
6mediumThe owner’s confidence of reaching the target by the end of the cycle: 6 of 10. 7 and above is high, 4 to 6 medium, 3 and below low.4 sectors
2026-10-01 · Razan Al-Rifai
6mediumThe owner’s confidence of reaching the target by the end of the cycle: 6 of 10. 7 and above is high, 4 to 6 medium, 3 and below low.2 sectors