O-3.2 · Surveys & Census Directorate

A successful pilot census with outputs that are followed up

On track

The surveys & census directorate owns the pilot census in two governorates and its results report.

Progress
⁦50%⁩

Expected by today ⁦30%⁩

Key results done
1 / 2

Of the objective’s key results

Average confidence
8.5

Of 10

Cycle
Q4 2026

2026-10-01 → 2026-12-31

KR-16.1Train 3,500 enumerators and field supervisors for the pilot census

Start
0 enumerators
Current
3,820 enumerators
Target
3,500 enumerators
Progress⁦70%⁩ ahead⁦100%⁩

Planned to date ⁦30%⁩

Done10highThe owner’s confidence of reaching the target by the end of the cycle: ⁦10⁩ of 10. 7 and above is high, 4 to 6 medium, 3 and below low.
Next update 29 October
Ayman SabbaghAyman SabbaghCensus & National Development Forum ConsultantP-045ayman.sabbagh@psa.gov.sy

The result since the cycle began

enumerators

Check-ins (⁦2⁩)

  1. 2026-10-15 · Ayman Sabbagh

    10highThe owner’s confidence of reaching the target by the end of the cycle: ⁦10⁩ of 10. 7 and above is high, 4 to 6 medium, 3 and below low.

    3,820 enumerators

    3,820 trained in person and 11,400 views of the remote training material.

  2. 2026-10-01 · Ayman Sabbagh

    8highThe owner’s confidence of reaching the target by the end of the cycle: ⁦8⁩ of 10. 7 and above is high, 4 to 6 medium, 3 and below low.

    0 enumerators

KR-16.2Publish the pilot census results report within 30 days of its end

Start
Not done
Current
Not done
Target
Done
Progress⁦0%⁩
On track7highThe owner’s confidence of reaching the target by the end of the cycle: ⁦7⁩ of 10. 7 and above is high, 4 to 6 medium, 3 and below low.
Next update 29 October
Ayman SabbaghAyman SabbaghCensus & National Development Forum ConsultantP-045ayman.sabbagh@psa.gov.sy

Check-ins (⁦2⁩)

  1. 2026-10-15 · Ayman Sabbagh

    7highThe owner’s confidence of reaching the target by the end of the cycle: ⁦7⁩ of 10. 7 and above is high, 4 to 6 medium, 3 and below low.

    Not done

  2. 2026-10-01 · Ayman Sabbagh

    8highThe owner’s confidence of reaching the target by the end of the cycle: ⁦8⁩ of 10. 7 and above is high, 4 to 6 medium, 3 and below low.

    Not done