O-4 · Authority level
A disciplined investment plan and projects delivered on time
Attracted investment funds what the budget cannot, and stalled projects eat the allocations; we close the year on target.
- Progress
- 29%
- Key results done
- 0 / 3
- Average confidence
- 5.7
- Cycle
- Q4 2026
Expected by today 30%
Of the objective’s key results
Of 10
2026-10-01 → 2026-12-31
KR-04.1Reach SYP 32bn of investment drawn into reconstruction this year
- Start
- 23.3 SYP bn
- Current
- 26.2 SYP bn
- Target
- 32 SYP bn
Planned to date 30%
The result since the cycle began
SYP bn
Check-ins (2)
2026-10-15 · Rasha Al-Mudarres
6mediumThe owner’s confidence of reaching the target by the end of the cycle: 6 of 10. 7 and above is high, 4 to 6 medium, 3 and below low.26.2 SYP bn
2026-10-01 · Rasha Al-Mudarres
7highThe owner’s confidence of reaching the target by the end of the cycle: 7 of 10. 7 and above is high, 4 to 6 medium, 3 and below low.24.3 SYP bn
KR-04.2Cut stalled or critical projects from 6 to 3
- Start
- 6 projects
- Current
- 5 projects
- Target
- 3 projects
Planned to date 30%
The result since the cycle began
projects
Check-ins (2)
2026-10-15 · Dr. Reem Al-Qabbani
5mediumThe owner’s confidence of reaching the target by the end of the cycle: 5 of 10. 7 and above is high, 4 to 6 medium, 3 and below low.5 projects
The cybersecurity programme left critical status after its corrective plan was approved.
2026-10-01 · Dr. Reem Al-Qabbani
5mediumThe owner’s confidence of reaching the target by the end of the cycle: 5 of 10. 7 and above is high, 4 to 6 medium, 3 and below low.6 projects
KR-04.3Raise savings from rationalised investment spending to SYP 2.125bn
- Start
- 1.4 SYP bn
- Current
- 1.5 SYP bn
- Target
- 2.1 SYP bn
Planned to date 30%
The result since the cycle began
SYP bn
Check-ins (2)
2026-10-15 · Rasha Al-Mudarres
6mediumThe owner’s confidence of reaching the target by the end of the cycle: 6 of 10. 7 and above is high, 4 to 6 medium, 3 and below low.1.5 SYP bn
2026-10-01 · Rasha Al-Mudarres
6mediumThe owner’s confidence of reaching the target by the end of the cycle: 6 of 10. 7 and above is high, 4 to 6 medium, 3 and below low.1.4 SYP bn