DMD-2026-013

M4 road rehabilitation (Ariha – Jisr al-Shughur)

Returned for completionImprovement
Electronic form
Priority score
55

Preliminary score from screening — confirmed after evaluation

Estimated cost
SYP 72.5M
Net present value
—

After the business case

Internal rate of return
—

After the business case

Payback period
—

After the business case

Rank in the 2027 plan
—
  1. Gate into «Submitted»DecisionGoDate1 September 2026DraftComplete
  2. Gate into «Initial review»DecisionGoDate6 September 2026SubmittedComplete
  3. Gate into «Feasibility»DecisionReworkDate10 September 2026Initial reviewCurrent stageCurrent stage
  4. Gate into «Evaluation»DecisionNot held yet4FeasibilityNot started
  5. Gate into «Committee review»DecisionNot held yet5EvaluationNot started
  6. Gate into «Approved»DecisionNot held yet6Committee reviewNot started
  7. Gate into «Prioritized»DecisionNot held yet7ApprovedNot started
  8. Gate into «Converted to project»DecisionNot held yet8PrioritizedNot started
  9. 9Converted to projectNot started

The request as filed

What the requester wrote on the intake form

Problem
The M4 road between Ariha and Jisr al-Shughur is damaged, so trips between Aleppo and the coast take longer and freight costs more.
Current state
Potholes and cracks over 38 km, and two small bridges with limited load capacity.
Objective
Studies and designs to rehabilitate the section ahead of a tender.
Expected scope
Topographic survey, pavement and bridge assessment, construction designs and the tender documents.

Expected benefits

Time & speed

A shorter trip once built

Strategic link

The objectives it serves and how well it aligns

Strategic alignment · Good

Related lessons learned

From similar past projects — read them before evaluation

Check the contractor’s financial capacity before award

From Aleppo 230 kV Substations Rehabilitation

The contractor ran into financial distress in month nine and transformer supply slowed; an executive task force was formed.

Recommendation: Add liquidity and existing commitments to pre-qualification for every tender over SYP 1.25bn.

Open the lesson