Proposal
Project proposal & feasibility study
Justification, objectives, benefits, cost and initial risks
- Form no.
- PSA-PMO-F01
- Template edition
- 2.1
- Version
- V1
- Form date
- 2026-09-01
Auto-filled — Filled by the platform from the project record, not typed.
- Proposal no.
- DMD-2026-013
- Proposal
- M4 road rehabilitation (Ariha – Jisr al-Shughur)
- Portfolio
- Reconstruction & Infrastructure Portfolio
- Sector
- Development Projects Follow-up Sector
- Sponsor
- Eng. Qasem Al-Hariri
- Proposed by
- Ola Al-Jandali
1The proposalAuto-filled
- TitleAuto-filled
- M4 road rehabilitation (Ariha – Jisr al-Shughur)
- Proposed byAuto-filled
- Ola Al-Jandali
- DepartmentAuto-filled
- Education & Rural Development Projects Directorate
- Submitted onAuto-filled
- 2026-09-01
- Proposal numberAuto-filled
- DMD-2026-013
2Justification
The problem or need
The M4 road between Ariha and Jisr al-Shughur is damaged, so trips between Aleppo and the coast take longer and freight costs more.
Today
Potholes and cracks over 38 km, and two small bridges with limited load capacity.
3Objectives
- Studies and designs to rehabilitate the section ahead of a tender.
Strategic objectives served
- SO-3.2 — Develop human capital in public bodies
4Expected benefits
| Kind | Benefit |
|---|---|
| Time saved | A shorter trip once built |
5Cost & feasibility
Estimated cost
SYP 72.5M
Funding
—
6Initial risks
| Risk | Level | Proposed response |
|---|---|---|
| No initial risks recorded | ||
Approval logChain: Proposal & feasibility approval · version 4
Every decision on the form — who, their role, the note and the time. It prints with the form.
| # | Step | Kind | Name | Decision | Note | Date & time |
|---|---|---|---|---|---|---|
| 1 | Author | — | Ola Al-JandaliChange Management Specialist | Submitted | — | 2026-09-01 09:30 |
| 2 | Line manager endorsement | Technical acceptance | Eng. Lina Al-AttarThe requester’s line manager | Approved | — | 2026-09-02 11:14 |
| 3 | PMO review | Methodology review | Mariam Al-ZoubiPMO — analyst | Returned for edit | Complete the cost estimate and the options before resubmitting. | 2026-09-03 12:21 |
Signatures
Line manager endorsement
Eng. Lina Al-Attar
Approved2026-09-02
PMO review
Mariam Al-Zoubi
Returned2026-09-03
Portfolio manager review
Eng. Wassim Al-Azm
Later
Cost & funding review
Rasha Al-Mudarres
Later
Project Approval Committee
Dr. Reem Al-Qabbani
Later