AI insight
Moaz Kaddour has time to give
Only 70% loaded in November 2026, with skills that open seats are asking for.Moaz Kaddour starts the plan tracker’s data preparation
Data Engineer · Data & AI Directorate
Load now
Under capacity
Free a week
12 h
40 h/week
This month’s cost
SYP 53.3K
At today’s allocation
Next peak
70%
In November 2026
AI insight
Only 70% loaded in November 2026, with skills that open seats are asking for.Moaz Kaddour starts the plan tracker’s data preparation
July 2026 to June 2027 — planned bars are faded, leave is shaded
Share of monthly capacity; the gold line is 100%
| Category | Projects | Outside projects | Total | Capacity |
|---|---|---|---|---|
| Jul | 70% | 0% | 70% | 100% |
| Aug | 70% | 0% | 70% | 100% |
| Sep | 70% | 0% | 70% | 100% |
| Oct | 70% | 0% | 70% | 100% |
| Nov | 70% | 0% | 70% | 100% |
| Dec | 70% | 0% | 70% | 100% |
| Jan | 53% | 0% | 53% | 100% |
| Feb | 0% | 0% | 0% | 100% |
| Mar | 0% | 0% | 0% | 100% |
| Apr | 0% | 0% | 0% | 100% |
| May | 0% | 0% | 0% | 100% |
| Jun | 0% | 0% | 0% | 100% |
Working days are Sunday to Thursday
Working days: 21 · days off: 0 · load 70%
Recorded leave
No leave recorded in this period
Levels 1 to 5, rated by the line manager
Professional certifications
The last eight weeks — billable and non-billable
Average week
40 h
40 h/week
Billable share
67%
Sent on time
7 of 7
| Category | Billable | Non-billable | Total |
|---|---|---|---|
| Week 37 | 27 h | 13 h | 40 h |
| Week 38 | 27 h | 15 h | 42 h |
| Week 39 | 27 h | 12 h | 39 h |
| Week 40 | 27 h | 14 h | 41 h |
| Week 41 | 27 h | 11 h | 38 h |
| Week 42 | 27 h | 14 h | 41 h |
| Week 43 | 27 h | 13 h | 40 h |
| Week 44 | 16 h | 8 h | 24 h |