Claim for a 120-day extension

In review

Incoming Letter, dated 5 October 2026

Syrian Arab Republic

Al-Bunyan Al-Mateen Contracting Co.

Number:
و/2026/0408
Date:
⁦5⁩ ⁦October 2026⁩
Attachments:
1

Subject: ⁦Claim for a 120⁩-day extension

The Director, Transport & Housing Projects, Planning and Statistics Authority

Greetings,

⁦We request a 120⁩-day extension of contract PSA/⁦2024/011 because the HV line on the block 4 site of the Darayya replacement housing has not been diverted⁩ — outside the contractor’s control — and it sits on the critical path.

With our kind regards,

Projects Director, Al-Bunyan Al-Mateen Contracting Co.

Eng. Anas Al-Sheikh

Copy to:

  • Dar Al-Khibra Engineering Consultants

Critical-path delay analysis