Eng. Nabil Al-Khalil
Site Manager — Al-Shahbaa Construction & Rehabilitation · Energy, Water & Utilities Projects Directorate
Eng. Nabil Al-Khalil
Site Manager — Al-Shahbaa Construction & Rehabilitation
- Mobile
- +963 93 730 4458
Engineering & construction delivery
Load now
Over-allocated
Free a week
0 h
48 h/week
This month’s cost
SYP 132.6K
At today’s allocation
Next peak
110%
In November 2026
- Planned as
- Field engineer
- Department
- Energy, Water & Utilities Projects Directorate
- Hourly cost
- SYP580
- 48 h/week
- Work location
- Substations site — Aleppo
- Joined
- 2024-01-14
Allocation across projects
July 2026 to June 2027 — planned bars are faded, leave is shaded
Monthly utilisation
Share of monthly capacity; the gold line is 100%
- Projects
- Outside projects
- Capacity
| Category | Projects | Outside projects | Total | Capacity |
|---|---|---|---|---|
| Jul | 110% | 0% | 110% | 100% |
| Aug | 110% | 0% | 110% | 100% |
| Sep | 110% | 0% | 110% | 100% |
| Oct | 110% | 0% | 110% | 100% |
| Nov | 110% | 0% | 110% | 100% |
| Dec | 110% | 0% | 110% | 100% |
| Jan | 110% | 0% | 110% | 100% |
| Feb | 12% | 0% | 12% | 100% |
| Mar | 0% | 0% | 0% | 100% |
| Apr | 0% | 0% | 0% | 100% |
| May | 0% | 0% | 0% | 100% |
| Jun | 0% | 0% | 0% | 100% |
Calendar & availability
Working days are Sunday to Thursday
Working days: 21 · days off: 0 · load 110%
Recorded leave
No leave recorded in this period
Skills & certifications
Levels 1 to 5, rated by the line manager
- Civil engineering5/5
- MEP engineering4/5
- Sustainability & environment3/5
Professional certifications
- Professional engineerSyrian Engineers Association · Issued 2012-02-01 · Expires 2027-02-01Valid
Timesheet summary
The last eight weeks — billable and non-billable
Average week
49 h
48 h/week
Billable share
100%
Sent on time
7 of 7
- Billable
- Non-billable
| Category | Billable | Non-billable | Total |
|---|---|---|---|
| Week 37 | 49 h | 0 h | 49 h |
| Week 38 | 51 h | 0 h | 51 h |
| Week 39 | 48 h | 0 h | 48 h |
| Week 40 | 50 h | 0 h | 50 h |
| Week 41 | 47 h | 0 h | 47 h |
| Week 42 | 50 h | 0 h | 50 h |
| Week 43 | 49 h | 0 h | 49 h |
| Week 44 | 29 h | 0 h | 29 h |