Provisional acceptance — Madinat al-Salam water network
Madinat al-Salam Drinking-Water Network (Quneitra)
Provisional acceptance — Madinat al-Salam water network
- Project
- Madinat al-Salam Drinking-Water Network (Quneitra) (PRJ-2026-036)
- Project manager
- Eng. Maher Al-Hamawi
- Budget
- SYP 1.68bn
- Progress
- 97% actual against 99% planned
- Forecast finish
- 2026-11-12
The acceptance committee certifies that the works listed were carried out to the contract and specification, with the attached snag list to be closed during the defects period.