Construction drawings — housing blocks, school & health centre
Darayya Replacement Housing
1. Description
Construction drawings — housing blocks, school & health centre — issued for review and coordination with the parties concerned.
- Project
- Darayya Replacement Housing (PRJ-2026-002)
- Project manager
- Eng. Qasem Al-Hariri
- Budget
- SYP 29.50bn
- Progress
- 42% actual against 51% planned
- Forecast finish
- 2027-09-12
2. Revision log
| Rev. | Description | By |
|---|---|---|
| V7 | Issued for review | Eng. Wael Al-Khawlani |
| V6 | Levels revised | Eng. Adnan Al-Mohammad |
| V5 | Issued for construction | Eng. Adnan Al-Mohammad |
| V4 | Utility diversions updated | Eng. Adnan Al-Mohammad |
Note: this issue is valid once signed by the supervising consultant and the project manager.
Prepared by
Eng. Wael Al-Khawlani
Project manager
Eng. Qasem Al-Hariri