RSK-0009Unified Government e-Services Platform

Reusing digital-signature components to shorten development

9OpportunityOpenOpportunity

A risk's detail, response, contingency and residual risk.

Risk statement

From enabler to opportunity to benefit — with the actions that seize it and the fallback

Enabler

The digital-signature and document e-verification system is live with reusable components (signing, forms, verification)

Actions to seize it

  • List the reusable components with the digital-signature team
  • Approve a shared architecture with the enterprise architecture office

2 / 2

Opportunity

Reuse the digital-signature components to shorten development

9OpportunityTrigger

The component assessment shows above 60% fit

Fallback

If merging proves hard, use an adapter layer instead of a full port

Benefit

About six weeks off wave 1 development and roughly SYP 27.5M saved

SYP 27.5M

Assessment

The level before and after the response

Inherent

5
4
3
2
1
1
2
3
4
5
9Opportunity

Residual

5
4
3
2
1
1
2
3
4
5
12Opportunity

Potential value

SYP 27.5M

Residual

No reduction expected — the response is to accept

Score trend

Last six months

  • Score
  • Target residual

Escalation path

Escalation engine: a high risk unreviewed for 10 days notifies the PM, 15 the programme manager, 20 the PMO director

Last reviewed 4 days ago · Outside the engine — below «high»

  1. Project manager

    Current level

    Eng. Tarek Al-Mardini

    Currently followed up here
  2. 2

    Programme manager

    Eng. Lina Al-Attar

  3. 3

    PMO director

    Dr. Reem Al-Qabbani

  4. 4

    Executive Council

    Dr. Samer Al-Daqqar

    By the PMO director’s decision

Mitigation plan

Actions to seize the opportunity, with owners and dates

⁦0⁩ of ⁦2⁩ done
  • List the reusable components with the digital-signature team

    Eng. Rita GhanemEng. Rita GhanemEnterprise ArchitectP-031rita.ghanem@psa.gov.sy
    In progressIn 8 days2026-11-05
  • Approve a shared architecture with the enterprise architecture office

    Eng. Nadine IsmailEng. Nadine IsmailEnterprise Architecture & Integration ConsultantP-042nadine.ismail@psa.gov.sy
    Not startedIn 28 days2026-11-25

Trigger

The component assessment shows above 60% fit

Fallback

If merging proves hard, use an adapter layer instead of a full port

Opportunity strategy

§26 — choose how you will seize it