RSK-0018Darayya Replacement Housing

Safety incidents around cranes and deep excavations

10MediumIn progress

A risk's detail, response, contingency and residual risk.

Risk statement

From cause to event to impact — with the preventive controls before the event and the contingency after it

Cause

Higher technical complexity than estimated and several systems to integrate

Preventive controls

  • An independent technical design review
  • Early tests on a pilot scope

2 / 2

Event

Safety incidents around cranes and deep excavations

10MediumTrigger

Any major acceptance test fails

Contingency

A temporary workaround until the fix is complete

Impact

Rework and later testing and commissioning

SYP 100M

Assessment

The level before and after the response

Inherent

5
4
3
2
1
1
2
3
4
5
10Medium

Residual

5
4
3
2
1
1
2
3
4
5
4Low

Exposure

SYP 100M

Residual

⁦60⁩% off the score

Score trend

Last six months

  • Score
  • Target residual

Escalation path

Escalation engine: a high risk unreviewed for 10 days notifies the PM, 15 the programme manager, 20 the PMO director

Last reviewed 14 days ago · Outside the engine — below «high»

  1. Project manager

    Current level

    Eng. Qasem Al-Hariri

    Currently followed up here
  2. 2

    Programme manager

    Eng. Qasem Al-Hariri

  3. 3

    PMO director

    Dr. Reem Al-Qabbani

  4. 4

    Executive Council

    Dr. Samer Al-Daqqar

    By the PMO director’s decision

Mitigation plan

Each action with its owner and date — tick it off when complete

⁦0⁩ of ⁦2⁩ done
  • An independent technical design review

    Eng. Qasem Al-HaririEng. Qasem Al-HaririDirector, Transport & Housing ProjectsP-020qasem.alhariri@psa.gov.sy
    In progressIn 245 days2027-06-30
  • Early tests on a pilot scope

    Eng. Qasem Al-HaririEng. Qasem Al-HaririDirector, Transport & Housing ProjectsP-020qasem.alhariri@psa.gov.sy
    Not startedIn 245 days2027-06-30

Trigger

Any major acceptance test fails

Contingency

A temporary workaround until the fix is complete