What if? — Energy & Water Portfolio

The portfolio’s digital twin: try a budget cut, a change in people, cancelled projects and new project proposals, and read each decision’s impact before you take it.

Savings needed

SYP 0

Savings the engine found SYP 0

Expected value after the decision

SYP 27.5BSYP 27.5B

keeps ⁦100.0%⁩

Weighted risk

7272

High-risk: ⁦1⁩ → ⁦1⁩

People

6767FTE

Need ⁦67⁩ of ⁦67⁩ available

Move a control to see what the engine suggests.

The engine’s recommendation per project

Lowest merit first. Click a card to read the full reasoning.

Keep5Reduce scope0Merge0Defer0Stop0

Keep

Continues as planned

The portfolio’s digital twin

Bubble colour is the engine’s recommendation; size is the project’s remaining cost.

The portfolio’s digital twin
  • Keep
  • Reduce scope
  • Merge
  • Defer
  • Stop
Cost remaining · SYP 3.9B
The portfolio’s digital twin
CategoryRisk scoreStrategic valueCost remainingChart legend
Aleppo 230 kV Substations Rehabilitation93.084.0SYP 3.9BKeep
20 MW Qalamoun Solar Field28.081.0SYP 998MKeep
Baniyas Pilot Seawater Desalination Plant62.061.0SYP 759MKeep
Suwayda Drinking-Water Network from Al-Ain Dam26.074.0SYP 658.8MKeep
Madinat al-Salam Drinking-Water Network (Quneitra)19.071.0SYP 49.8MKeep

From remaining spend to spend after the decision

From remaining spend to spend after the decision
  • Total
  • Increase
  • Decrease
From remaining spend to spend after the decision
CategoryChangeRunning total
Remaining spend todaySYP 6.9BSYP 6.9B
After the decisionSYP 6.9BSYP 6.9B

Saved scenarios, compared

Pick up to three scenarios to compare side by side on budget, benefits, risks and resources.

  • A — 15% budget cut

    Ready-made

  • B — 10% cut with 10% fewer people

    Ready-made

  • Current scenario (not saved)

Scenario comparison

AA — 15% budget cutBB — 10% cut with 10% fewer people
Budget cut⁦15%⁩⁦10%⁩
People change0%−10%
Cancelled projects——
Added proposals——
Savings foundSYP2.4BSYP2.2B
ShortfallSYP141.2MTarget met
Value after the decisionSYP23.5B⁦85.3%⁩SYP23.7B⁦86.2%⁩
Risk after the decision7069
People needed48 / 6750 / 60
RecommendationsKeep 2Reduce scope 2Stop 1Keep 3Reduce scope 1Stop 1