Risk matrix
The probability and impact scales, the level bands and their colours, and the material-risk rule — live preview and approved versions.
Level bands
Score = probability × impact (1–25). Pick the score each level starts at.
The possible scores and where each falls
Level colours
Each level’s colour on the heat map and the score chips. The colours come from the system’s identity and stay readable in both themes.
- Critical
- High
- Medium
- Low
Material-risk rule
A «material» risk is highlighted in the register, the meeting packs and the periodic reports by the same rule.
Material now: score 15 and above
Probability scale
Leave a field empty to use the default label.
- 1
Default: نادر
- 2
Default: غير مرجح
- 3
Default: محتمل
- 4
Default: مرجح
- 5
Default: شبه مؤكد
Impact scale
Leave a field empty to use the default label.
- 1
Default: طفيف
- 2
Default: محدود
- 3
Default: متوسط
- 4
Default: كبير
- 5
Default: جسيم
Live preview
The open risks in your scope on the matrix as it will look once approved.
Probability ↑ · Impact
Spread across the levels
Approved → edited
- Critical66
- High1212
- Medium2424
- Low33
Material: 18 → 18
What will change
No risk changes level with these edits.
Version history
Every approval is kept as a version; nothing before it is deleted.
- 2
Version 2In force
2026 review: «medium» now starts at 8, so a score of 8 (P2 × I4) counts
2026-01-18 10:30 · Dr. Reem Al-Qabbani · Medium 8 · High 15 · Critical 20
- 1
Version 1
First version, approved with the risk & business-continuity framework
2025-03-02 09:00 · Nizar Abu Fakhr · Medium 9 · High 15 · Critical 20