Strategy setup
The strategic structure’s levels, the OKR model, and the measurement and review cycles — set up without code.
- Structure levels
- 7
- OKR levels
- 3
- Measurement cycles open now
- 1
- Next review
- 2026-12-15
From the vision down to the project, directions on
Authority, Sector or executive division, Department
Closes 2026-11-05
Mid-term strategy review
Published version 4 · 2026-10-12
Levels of the strategic structure
Top down, as the plan is built. Rename any level, or switch the directions layer off if the Authority does not use it.
- 1
Vision, mission & values2026–2030
The framework’s top statement and its five values, with their versions
Owner: The Higher Council for Economic DevelopmentIn the current plan: 1
- 2
Strategic pillarPIL-2Children’s weights = 100%
Economic recovery · Reconstruction · Human development · Food security · Governance & digital · Balanced local development
Owner: The President of the AuthorityIn the current plan: 6
- 3
Strategic directionDIR-2.1
An optional layer between a theme and its objectives that groups related objectives
Owner: The deputy president who owns the pillar
- 4
Strategic objectiveSO-2.1Children’s weights = 100%
A measurable objective with an owner and a weight in its theme
Owner: The objective ownerIn the current plan: 12
- 5
Key performance indicatorK-2.1.2
A formula, a data source, a frequency and a target per period
Owner: The KPI ownerIn the current plan: 30
- 6
Initiative or programmeINI-01Children’s weights = 100%
What is delivered to reach the objective, with each project’s contribution share
Owner: The initiative ownerIn the current plan: 15
- 7
ProjectPRJ-2026-014
Run in the project system; it feeds the initiative’s progress automatically
Owner: The project managerIn the current plan: 36
Weight check
Each theme’s objective weights must reach 100% before the plan is approved.
- Economic Recovery & Monetary Stability2 objectives100%
- Reconstruction & Infrastructure2 objectives100%
- Human Development2 objectives100%
- Food Security & Rural Development2 objectives100%
- Governance & Digital Transformation2 objectives100%
- Balanced Local Development across the Governorates2 objectives100%