Methodologies
Methodology templates, lifecycles, gates and smart checklists.
- Methodology templates
- 5
- Projects on the templates
- 36
- Gates defined
- 14
- Checklist items
- 33
For every project type and size
Every project of the entity
Across every template
29 of them mandatory
Project types
A configurable list: add a type, rename or retire it, and set the methodology every new project of that type starts on.
Active types
7Retired types
1Projects classified
36- Construction4 projectsReplacement housing, hospitals, faculties and industrial cities: design, build, supervision and acceptance.
- Infrastructure & facilities12 projectsPower, water and wastewater plants, roads, bridges and fibre.
- Digital platforms & services8 projectsThe unified e-services platform, the mobile app, e-litigation, digital signature and the national indicators portal.
- Information technology7 projectsEnterprise systems, cloud, cybersecurity and data centres.
- Consulting & studies2 projectsThe medium-term plan, governorate plans, performance measurement and sector studies.
- Services & events2 projectsThe National Development & Reconstruction Forum, planning workshops with the governorates and e-learning.
- Organisational transformation1 projectOperating model, accountability and capability building at the Authority and public bodies.
- Research & pilotsRetiredPilots and proofs of concept before scaling up.